What comes out
Cabinetry, fixtures, tiling, flooring and subfloor, non-structural partitions, ceilings, and the finishes behind all of it. What stays is the frame, the load paths, and anything feeding the rest of the house.
A strip-out is a controlled subtraction. The job is knowing what holds the house up and what does not, then removing only the second thing.


Cabinetry, fixtures, tiling, flooring and subfloor, non-structural partitions, ceilings, and the finishes behind all of it. What stays is the frame, the load paths, and anything feeding the rest of the house.
Live services are what turns a straightforward strip-out into a bad week. Water, gas and electrical runs are identified before the first wall opens, not after.
On detached property the work is often happening while the family is still there, or planning to come back to it. Dust containment, which door the material leaves by, and what gets protected on the way out are part of the job rather than an afterthought.
What is coming out, what is staying, and what is live behind it.
Services capped, and protection to the areas that stay.
Worked back in sequence rather than opened up all at once.
Loaded and hauled off, floor swept and ready for the next trade.